Royer Transmission
- Date Completed: January 2016
- Project Location: Rosemead, CA
- Project Category: underground
- Project Owner: SCE Transmission
International Line Builders installed four 10 foot x 20 foot vaults, 3,200 feet of trench with six 5-inch encased conduit duct bank and 100 feet of 28-inch bore casing at approximate 23 feet in depth.