Projects
Solar Star Tower Raise
- Date Completed: 2014
- Project Location: Los Banos, CA
- Project Category: transmission and distribution
- Project Owner: Pacific Gas and Electric
This reconductor double-circuit project included new fiber and spanned 32 miles. Reconductor required the use of a helicopter.
